Los Teros Wind Farm
The park has been developed in 2 stages: Los Teros I, 123 MW, in operation since 2020. Los Teros II, 52MW, in operation since May 2021.
175 MW
INSTALLED CAPACITY
45
WIND TURBINES
838 GWh/año
GENERATED POWER1
55%
CAPACITY FACTOR1
POWER FOR
237.000
HOMES1
408.500
TONS OF CO2
FIXED PER YEAR
1. Estimation when both stages are operational