Los Teros Wind Farm

The park has been developed in 2 stages: Los Teros I, 123 MW, in operation since 2020. Los Teros II, 52MW, in operation since May 2021.

RayoIcon.png
175 MW
INSTALLED CAPACITY
Lineamientos2.png
45
WIND TURBINES
RayoIcon.png
838 GWh/año
GENERATED POWER​1
ChartIcon.png
55%
CAPACITY FACTOR1
CasaIcon.png
POWER FOR
237.000
HOMES1
NubeIcon.png
408.500
TONS OF CO​2
FIXED PER YEAR​
1. Estimation when both stages are operational