
Download community report
Download
Los Teros Wind Farm
The park has been developed in 2 stages: Los Teros I, 123 MW, in operation since 2020. Los Teros II, 52MW, in operation since May 2021.

175 MW
INSTALLED CAPACITY

45
AEROGENERADORES

838 GWh/year
GENERATED POWER1

55%
FACTOR DE CAPACIDAD1

POWER FOR
237.000
HOMES1

![]()

408.500
TON DE CO2
EVITADAS POR AÑO
1. Estimation when both stages are operational
Standards and Certifications