Los Teros Wind Farm

The park has been developed in 2 stages: Los Teros I, 123 MW, in operation since 2020. Los Teros II, 52MW, in operation since May 2021.

RayoIcon.png
175 MW
INSTALLED CAPACITY



Lineamientos2.png​​
45
AEROGENERADORES



RayoIcon.png
838 GWh/year
GENERATED POWER1

ChartIcon.png
55%
FACTOR DE CAPACIDAD1

CasaIcon.png
POWER FOR
237.000
HOMES1
NubeIcon.png
408.500
TON DE CO​2
EVITADAS POR AÑO
1. Estimation when both stages are operational